Control Tower 2
The second Air Traffic Control tower will be constructed during Phase-I as part of the Al Maktoum International (DWC) expansion. It will complement the first Control Tower, in service since 2010, to handle operations of the expanded airfield.
Jump to section
Phase 1
The first phase of AMI will start with the construction of theWest Terminal Building, connected to the city through a new express metro line, and the Concourse 1 with 100 contact gates.
The 4-stations underground APM will be built to enable the passenger’s fast connection.
The airfield will see the construction of Runway 2 and 3 along with the Ground Service Equipment road network, and an undergroundBaggage Handling Systemfor quick baggage transfer.
Energy centres, Fire safety and other Support Facilitiesfor Duty free and catering, maintenance and storage will be constructed at the North side of the airport to provide the best operational and commercial support services.
Phase 1 will provide a capacity of 130 M annual passengers.
Phase 2
In the next decade, the second phase of AMI will further enhance the level of service with the construction of theConcourse 2, parallel and identical to Concourse 1, enabling the seamless flow of150 M annual passengers across 200 contact gates.
3 new APM stations will be built to serve Concourse 2, as well the expansion of the ground service equipment roads network and the automated Baggage Handling System
Support Facilities will be further expanded to match the new airport capacity.
Ultimate Phase
The final development phase will start with the construction of Concourse 3 and 4, and the East Terminal, enabling ground transportation access from the East side of the city.
This will include a connection to the Etihad Rail and the new metro line. Runway 4 and 5 will complete the airfield enabling 4 aircraft parallel approaches. The APM will be expanded to become a 14-station system connecting all airside buildings in a giant loop.
In its ultimate configuration, AMI will be able to serve annually 260 M passengers though 400 contact gates and process 15 M tons of cargo.
About This Project
Representing Dubai's aviation ambition
Control Tower 2 will be slightly taller than the first Control Tower at DWC. The two control towers will, however, serve different functions. Control Tower 2, set in the centre of the airfield, will be able to visually and technically coordinate activities across 400 contact gates, five runways and four concourses.
Future Projects
Concourse 1
Concourse 1
The concourses at Al Maktoum International (DWC), starting with the construction of Concourse 1, will be the pinnacle of future air travel with facilities that deliver an awe-inspiring passenger experience.
Concourse 2
Concourse 2
Concourse 2 will be the second concourse built at Dubai World Central.
Concourse 3
Concourse 3
In addition to Concourses 1 and 2, Concourse 3 will be the third concourse at Dubai World Central and the first on the eastern side of the platform.
Concourse 4
Concourse 4
Concourse 4 will be the fourth and final concourse at Dubai World Central.